Project Overview

This Redmond “English chateau” had all the storybook details—stonework, archways, a cupola clock, timber framing—but the stucco cladding was failing. Synapse delivered a modern, low-maintenance solution without losing the home’s classic character. We produced a 3D design, coordinated removal of failing stucco, repaired substrate, and installed a clean, durable Trespa system that aligns with the architecture.

Scope of work

  • 3D design & visualization to explore façade options and trim reveals

  • Careful stucco removal, substrate inspection, and repairs

  • New weather-resistive barrier, flashing, and rainscreen detailing

  • Install Trespa Pura NFC® flush siding in Siberian Larch

  • Tie-ins at windows/doors, stone transitions, and timber elements

  • Final QA and homeowner walkthrough

Materials & details

  • Cladding: Trespa Pura NFC® flush siding — Siberian Larch

  • Assembly: continuous air/water barrier, rainscreen gap, kick-out flashing

  • Transitions: precise trim at stone returns, archways, and timber frames

  • Look: warm wood-tone planks with crisp, consistent reveals

Why these materials

Trespa Pura NFC® provides the refined, uniform look the owners loved about stucco—without the cracking and moisture concerns. The Siberian Larch finish delivers a timeless, wood-like aesthetic with low maintenance. Combined with proper rainscreen and flashing, the façade is drier, tougher, and longer-lasting in Northwest weather.

Before / After highlights

  • Before: failing stucco, hairline cracking, moisture risk at transitions

  • After: warm, modern planks with clean lines; improved drainage and durability—the architecture shines while the envelope performs

Location & scope

  • City: Redmond, WA

  • Scope: Design → stucco removal → reclad with Trespa Pura NFC® → detailing at stone/timber interfaces

Timeline & coordination (typical)

  • Design & options review: ~2–4 weeks

  • Permitting/HOA (if applicable): varies

  • On-site reclad: ~2–4 weeks (weather dependent)

Ready to plan yours?

“They are knowledgeable, dependable, honest, and effectively communicated throughout the project. They helped guide the project through appropriate detailing and technical challenges while finely crafting a crisp and refined building enclosure. Without hesitation I have the highest recommendation for Synapse Construction.”

D. Rusler
A Simple & Clear Process

Synapse Project Success Plan

Learn how we'll make your project a success.
Get Started